D.O.D. OKs prototype mobile nuclear reactor in Idaho
       |           

Welcome, Guest. Please login or register.
Did you miss your activation email?
June 03, 2024, 03:09:12 AM
News: Election Simulator 2.0 Released. Senate/Gubernatorial maps, proportional electoral votes, and more - Read more

  Talk Elections
  General Politics
  U.S. General Discussion (Moderators: The Dowager Mod, Chancellor Tanterterg)
  D.O.D. OKs prototype mobile nuclear reactor in Idaho
« previous next »
Pages: [1]
Author Topic: D.O.D. OKs prototype mobile nuclear reactor in Idaho  (Read 112 times)
certified hummus supporter 🇵🇸🤝🇺🇸🤝🇺🇦
AverageFoodEnthusiast
Junior Chimp
*****
Posts: 5,395
Virgin Islands, U.S.


WWW Show only this user's posts in this thread
« on: April 22, 2022, 10:32:22 AM »

Quote
BOISE, Idaho (AP) — The U.S. Department of Defense plans to build an advanced mobile nuclear microreactor prototype at the Idaho National Laboratory in eastern Idaho.

The department late last week signed off on the Project Pele plan to build the reactor and reactor fuel outside of Idaho and then assemble and operate the reactor at the lab.

The decision follows a two-volume, 600-page environmental impact statement that includes public comments evaluating alternatives for building and operating a gas-cooled microreactor that could produce 1 to 5 megawatts of power.

“Advanced nuclear power has the potential to be a strategic game-changer for the United States, both for the (Department of Defense) and for the commercial sector,” said Jeff Waksman, program manager for Project Pele. “For it to be adopted, it must first be successfully demonstrated under real-world operating conditions.”

officials had previously said preparing testing sites at the Idaho National Lab and then building and testing the microreactor would take about three years. The department said the project is subject to the availability of appropriations.

The department said two reactor designs are being considered, and one chosen will be announced later. The department said both designs are high-temperature gas-cooled reactors using enriched uranium for fuel.

https://apnews.com/article/technology-science-business-environment-idaho-675b6da044293ab8b676e68308e30b04
Logged
Person Man
Angry_Weasel
Atlas Superstar
*****
Posts: 36,667
United States


Show only this user's posts in this thread
« Reply #1 on: April 22, 2022, 11:20:32 AM »

Quote
BOISE, Idaho (AP) — The U.S. Department of Defense plans to build an advanced mobile nuclear microreactor prototype at the Idaho National Laboratory in eastern Idaho.

The department late last week signed off on the Project Pele plan to build the reactor and reactor fuel outside of Idaho and then assemble and operate the reactor at the lab.

The decision follows a two-volume, 600-page environmental impact statement that includes public comments evaluating alternatives for building and operating a gas-cooled microreactor that could produce 1 to 5 megawatts of power.

“Advanced nuclear power has the potential to be a strategic game-changer for the United States, both for the (Department of Defense) and for the commercial sector,” said Jeff Waksman, program manager for Project Pele. “For it to be adopted, it must first be successfully demonstrated under real-world operating conditions.”

officials had previously said preparing testing sites at the Idaho National Lab and then building and testing the microreactor would take about three years. The department said the project is subject to the availability of appropriations.

The department said two reactor designs are being considered, and one chosen will be announced later. The department said both designs are high-temperature gas-cooled reactors using enriched uranium for fuel.

https://apnews.com/article/technology-science-business-environment-idaho-675b6da044293ab8b676e68308e30b04

My college roommate works for one of the competitors on this project. He works for a neoconservative super donor named Zeke Moskowitz.
Logged
Aurelius
Cody
YaBB God
*****
Posts: 4,163
United States


Political Matrix
E: 3.35, S: 0.35

P P
Show only this user's posts in this thread
« Reply #2 on: April 22, 2022, 11:29:05 AM »

Extremely based.
Logged
Pages: [1]  
« previous next »
Jump to:  


Login with username, password and session length

Terms of Service - DMCA Agent and Policy - Privacy Policy and Cookies

Powered by SMF 1.1.21 | SMF © 2015, Simple Machines

Page created in 0.226 seconds with 11 queries.